|
Product Details:
|
| Condition: | New | Applicable Industries: | Machinery Repair Shops, Construction Works , Road Construction Work |
|---|---|---|---|
| Video Outgoing-inspection: | Provided | Marketing Type: | Hot Product |
| Delivery Time: | 5-10 Days After Payment | Delivery Term: | TT/LC/Western Union |
| Machine Model: | S1900-3/S2100-3 | Quality: | High Guarantee |
| After Warranty Service: | Video Technical Support | Port: | Shanghai |
| Highlight: | S1900-3 main auger shaft assembly,S2100-3 auger shaft 4622012506,dual-hole auger bearing block assembly |
||
The S1900-3 / S2100-3 Main Auger Shaft Assembly (Part No. 4622012506) is a core drive and support component of the paver's auger system. It is installed in the auger area at the rear of the paver, in front of the screed. The main auger shaft runs transversely and is driven by the central drive box or side motors, with both ends supported by bearing housing assemblies.
Its function is to distribute the asphalt mixture delivered by the conveyor continuously and evenly from the center to both the left and right sides across the full paving width, ensuring a stable and uniform material flow ahead of the screed. This contributes to consistent surface smoothness and compaction uniformity. The double auger bearing block assembly (dual-hole) provides rigid support and rotational positioning for the auger shaft ends, bearing the radial and axial loads during material distribution. It is critical to maintaining auger shaft running accuracy and extending shaft service life.
| Product Name | Auger Shaft Assembly |
|---|---|
| Part No. | 4622012506 |
| Type | Single Hole |
| Applicable Models | S1900-3 / S2100-3 |
| Condition | 100% New |
| Quality | High |
| MOQ | 1 pc |
| Port | Shanghai |
A1: Yes, we have workshops and automatic production lines for rubber products, screed plates, and electronic products. For other items, we are an OEM supplier.
A2: Our annual output is 650,000 track pads.
A3: We can provide samples, but the sample fee and freight are to be paid by the buyer.
A4: Yes, it depends on the product. Normally, an MOQ of 1 pc is acceptable.
A5: Around 7–10 days, depending on the product and quantity. Please confirm with your sales representative.
A6: TT, LC at sight, and DP are all acceptable and negotiable on a case-by-case basis.
A7: We offer FOB Shanghai or EXW with the factory address in Taicang, Suzhou City, Jiangsu Province. Please send your destination port for a CIF quote.
A8: Air freight, train, or sea shipment.
Contact Person: vivi
Tel: +8615250571130